The assignment of Consultant Artelia comprised of update of the existing Feasibility Study, Topographical and Geotechnical Survey on the WWTP Site, Preliminary Design of the WWTP, Preparation of Tender Documents, Full Environmental Study And Sludge Treatment Specific Approach. About 160,000 inhabitants are concerned. Consultancy Completed