In line with the stated mission of the Government to connect 50% of the population by 2030, the WMA is committed to meet the target set with the completion of the ongoing projects in the region of Plaines Wilhems, Parisot, Verger Bissambar and the forthcoming projects in the Pailles-Guibies region.
CHA Phase IV – Rehabilitation Infrastructure at Residence Malherbes B, Curepipe
Consultancy Services For Feasibility Study And Detailed Design Of Wastewater Disposal System At Cite EDC Riviere Du Rempart
CHA Phase IV– Rehabilitation Infrastructure at Residence Palmerstone, Phoenix
Sewerage Project at Residence Sadally, Vacoas
Highlands Sewerage Project
Sewer Rehabilitation Works at Raoul Rivet Street Port Louis
Detailed Design, Preparation Of Bidding Documents And Supervision Of Works- Lot 1- Bain Des Dames, Cassis
Camp Caval and Robinson Sewerage Project
Vallée Des Prêtes and Tranquebar Sewerage Project
West Coast Sewerage Project (Consultancy Services)
Pointe aux Sables Sewerage Project
Detailed Design, Preparation Of Bidding Documents And Supervision Of Works- Lot 2- Caro Lalo, Vallee Des Pretes (Consultancy Services)
CHA Phase IV – Rehabilitation Infrastructure at Residence La Cure, Port Louis
CHA Phase IV – Rehabilitation Infrastructure at Residence Paul et Virginie, Port Louis
Pailles Guibies Sewerage Project Phase 1
Plaines Wilhems Sewerage Project – Lot 1A
Kensington Place Sewerage Project
Camp Rouillard Sewerage Project
Cite Atlee Sewerage Project
Sewerage Project at Morcellement Goolamally
Nehru Sewerage Project Phase 2
Valentina Sewerage Project
Nehru Sewerage Project Phase 1
Pailles Guibies Sewerage Project Phase 2
Grand Baie Phase 1B
Urgent Upgrading of Sewer Network along Avenue Pere Laval, Ste Croix (From its Junction with Avenue des Roses to its Junction With Avenue Latanier)
Design and Construction of House Connections in the Sewered Areas of Mauritius (Framework Agreement)
Sewerage Project at Curepipe, Wooton & Abbe de la Caille-Phase 1
Wastewater Rehabilitation Works at Dubreuil
Proposed Wastewater Project for Connection at Flats Guillard, Pointe aux Sables
Procurement of Transaction Advisory Services for the BOT Project for new Roche Bois Pumping Station and new Baie du Tombeau WWTP
Consultancy Services for the Feasibility Study and Preliminary Design for Port Mathurin, Rodrigues Sewerage Project
Wastewater Project at Route Bassin, Quatre-Bornes-Phase 1